To perform this operation we must begin by placing the metal bracket every 60 cm, height calculated according to the ridge piece. Once the legs bent at the correct height, they can be nailed directly to the floor. After that, the ridge batten holder / hip line will be installed.

Another way to finish the ridge or hip line is by Band Waterproof Figaroll, eliminating the use of mortar on wooden nail being due. Made of polypropylene mesh inserted barber aluminum, waterproof and ventilate the area of ridge and hip line.

In the attached picture the assembly steps are shown in ridge line:

Fases montaje
  1. Waterproofing of the ridge line
  2. Close side gable
  3. Side skirt shot area
  4. Installation of the ridge wedges
  5. Enclosure with side cover